Skip to page navigationSkip to page content

MARR 43 - Composite Tooling

  • Prerequisite: MARR 41 or instructor approval

Uses the mold stations and stem form built in MARR 41 to erect a hull skeleton on a building form. Transoms are fabricated. A skin or planking of foam or wood is applied. Spiling techniques are emphasized. Fairing of the hull is practiced.

Contact: 120 hours lecture/lab per term

Student Learning Outcomes

Upon successful completion of MARR 43, the student will be able to:

  • Calculate material(s) needed to construct the tool/plug
  • Understand the importance of "fairness" as it relates to plug fabrication
  • Prepare a plug for mold fabrication
  • Demonstrate hand lamination techniques
  • Understand and fabricate plug flanges for reinforcing of the plug
  • Application of plug tooling surface coatings
  • Practice fairing techniques